Author name: Endy

Endy Gunawan is the Director at Kharisma Group and holds a degree in Engineering, which provides the technical foundation for his expertise in complex infrastructure. He specializes in providing integrated solutions for industrial piping, prefab steel structures, and water storage systems. Endy is dedicated to driving innovation and excellence across Indonesia’s industrial landscape, ensuring that engineering precision meets strategic growth.

Victaulic couplings

Victaulic Couplings: The International Standard for Grooved Pipe Joining

Modern construction and industrial projects demand piping systems that are fast to install, easy to maintain, and built to last. Victaulic couplings have become the international benchmark for mechanical grooved pipe joining, trusted by engineers and contractors in over 120 countries. In Indonesia, demand for Victaulic couplings is growing rapidly as infrastructure development accelerates across […]

Victaulic Clamp

Victaulic Clamp: The Reliable Pipe Joining Solution for Industry in Indonesia

A Victaulic clamp is one of the most important components in any modern piping installation. It is used to connect two pipe ends quickly, securely, and without the need for welding or threading. As Indonesia continues to grow its industrial, construction, and infrastructure sectors, demand for high quality Victaulic clamps has never been higher. Aiko

How Many Types of Dewatering Are There in Mining?

How Many Types of Dewatering Are There in Mining?

Dewatering in mining isn’t limited to a single fixed number of “types”—it varies depending on the context (e.g., groundwater control in pits/underground workings vs. processing tailings/slurries). Sources describe anywhere from 3–4 main categories to 8–10+ specific techniques or equipment-based methods. Broadly, mining dewatering falls into two primary categories: Within these, there are numerous specific methods

What is a Flow Meter for Dewatering?

What is a Flow Meter for Dewatering?

In mining and dewatering operations, a flow meter for dewatering is a specialized instrument that measures the flow rate (volume per time, e.g., liters per second or cubic meters per hour) of water or slurry being pumped out of a site. This includes groundwater from pits or sumps, seepage from underground workings, reclaimed process water,

Pipa Baja Balikpapan

Pipa Baja Balikpapan

Balikpapan adalah kota industri migas dengan standar keamanan perpipaan yang paling ketat di Indonesia. Fasilitas Pertamina, kilang minyak, dan kawasan industri Kariangau menggunakan spesifikasi pipa baja berstandar internasional. Aiko Pipa menyediakan pipa baja yang memenuhi standar industri migas untuk proyek-proyek di Balikpapan dan seluruh Kalimantan Timur. Lihat lebih lanjut tentang Aiko Pipa di aikopipa.co.id. Temukan

Pipa Baja Palembang

Pipa Baja Palembang

Palembang adalah kota industri petrokimia dan perkebunan terbesar di Sumatera Selatan. Kilang Pertamina Plaju, kawasan industri Sungai Gerong, dan jaringan infrastruktur kota terus berkembang dan membutuhkan pasokan pipa baja yang konsisten. Aiko Pipa hadir sebagai supplier pipa baja yang tepat untuk semua kebutuhan industri dan konstruksi di Palembang. Kenali Aiko Pipa lebih jauh di aikopipa.co.id.

Dewatering in Engineering

What is Dewatering in Engineering?

Dewatering in engineering is the process of removing water—such as groundwater, surface water, seepage, or process water—from a specific location to create dry, stable, and safe working conditions. This is a fundamental technique across several engineering disciplines, including civil, geotechnical, mining, and construction engineering. The goal is to lower the water table, drain excess moisture,

HDPE Pipa Jakarta

HDPE Pipa Jakarta

Jakarta adalah kota dengan proyek perpipaan terbesar dan terpadat di Indonesia. Gedung pencakar langit, kawasan industri, dan jaringan distribusi air PDAM DKI semuanya bergantung pada pipa yang andal. Aiko Pipa hadir sebagai supplier pipa HDPE terpercaya untuk proyek skala kecil hingga mega proyek di seluruh Jakarta. Kenali lebih lanjut tentang Aiko Pipa di aikopipa.co.id. Lihat

Underground Mine Dewatering Explained

Underground Mine Dewatering Explained

Underground mine dewatering is the critical process of removing or controlling groundwater, seepage, and process water from below-ground mining workings. When mines extend below the natural water table, water infiltrates through fractures, faults, porous rock, or roof/floor seepage—potentially causing flooding, unstable ground, equipment damage, safety hazards, and halted production. Effective dewatering keeps shafts, tunnels, stopes,

How to Prevent Slurry Buildup on Mining Equipment

How to Prevent Slurry Buildup on Mining Equipment

Slurry buildup on mining equipment—like pumps, pipelines, sumps, valves, and chutes—causes blockages, reduced flow, increased wear, higher energy use, and costly downtime. In abrasive mining environments (common in Indonesian coal, nickel, or gold sites), solids settle, cake up, or erode surfaces if not managed properly. Preventing buildup starts with good design, consistent monitoring, and proactive

Let's Chat
Scroll to Top